Holy Trinity Church, Coventry

The works to Holy Trinity Church were carried out over a 25 week period and included high level masonry replacement to merlons and embrasures, complete renewal of timber and lead coverings to the Chancel roof, reforming valley gutters and renewal of lead downpipes and ornate lead hoppers.

On a previous phase during investigation works our Site Manager uncovered remarkable pictures of the craftsmen who carried out work the last time the roof was re-covered in the 19th Century.
These photos were found within the roof void and during the renewal works the original photos were carefully put back along with pictures of the present team of craftsmen for this phase.